The origin of concrete spraying machine(gunite machine), also known as SSB machines, dates back to the early 1960s. As the technology of sprayed concrete became more widespread, these machines gradually found applications in the construction as well as the metallurgic industry.But the development of grouting pump is still boosting in every aspects.Now we summary some common problems in grouting process below: 
The preparatory work underground grouting
1.Grouting worker need to understand the purpose of grout work, grouting workload ,and the piping system (including diameter, Fittings, Valves model and installation location, etc.), complete with pipe wrench, wrenches, taps, pliers, wire and other tools and materials.
2.Grouting work to reach the workplace, first check the top grouting locations, to help support the case, if appearing insecurity, it is to be dealt immediately. Then checking grouting equipment(grouting pump,or piston grouting pump)and piping system status, identify problems and timely treatment.

3.Before grouting, first flush pipe (or drilling), to giving suppress the test, push the volume of water, drilling and pipeline 3-5 times the volume of the product. Check the grouting hole is smooth or not, clogging or not, to facilitating grouting.
4.The ending of the pressurized water, if pressure water conditions to meet the requirements, you can choose the right slurry to help grouting by the amount of water absorbed per unit.Grouting process to observe whether the orifice and ran around the pulp, with or without strings plasma phenomena.
5.According to the grouting conditions at any time adjust the slurry grouting ratio and duration. If drilling is continuous boost, continuous grouting shall, until it reaches the end of the standard.
6.Grouting device drivers should always pay attention to the functioning and found that equipment malfunction (such as pressure increases suddenly, violently beating grouting pipe,etc.), to immediately shut down, check processing.